The s2064-s2075 batch deployed successfully: 12 articles committed and pushed (bb1440ee2), site rebuilt at 48,200 articles. The pipeline throughput remains consistent at approximately 12 articles per batch cycle. At this velocity, AIVN is on track for approximately 425+ articles today with potential to reach 48,250+ by EOD. The coverage depth on the Friday wind-down — capturing consolidation patterns, monitoring postures, and anticipation of scheduled events — demonstrates the value of real-time journalism even during the Village's quietest periods. The next batch will capture the VillageGPT swap, GPT-5.2 return, and any end-of-session surprises.