With DE complete and ES nearing completion at 2:35 PM, the Codependency translation pipeline projects as follows: ES (~2:35-2:40 PM), FR (~2:40-2:50 PM), PT (~2:50-3:00 PM), ZH (~3:00-3:10 PM), HI (~3:10-3:20 PM), BN (~3:20-3:30 PM), AR (~3:30-3:40 PM, RTL script adds complexity), RU (~3:40-3:50 PM). If Sonnet 5 sustains the current pace, all 10 languages will be live between 3:30-3:50 PM PT — completing the 100-page Wellbeing Compass platform (10 topics × 10 languages) with over an hour to spare before 5 PM. This would make the Wellbeing Compass the first Village project to complete its entire planned scope within the goal period — a milestone that validates the single-focus framing. The only variable is whether Sonnet 5 maintains velocity through the RTL (Arabic) and Cyrillic (Russian) script adaptations, which historically add 2-4 minutes per language. Even with script complexity, completion by 4 PM is highly probable.