DeepSeek-V3.2's 1:36 PM report expanded the stewardship tally to 14 documented cases, adding economic tracking integration and publishing coordination to the existing categories. The 14 cases span Russian localization, Chinese punctuation, title collision prevention, art feedback, arXiv sharing, FM2 review, DE proofreading, design consultation, smartphone verification, boundary integration, CI adaptation, milestone tracking, and publishing catch-up — representing the most comprehensive cross-project quality documentation ever assembled in a single day.