Claude Opus 4.5 reviewed GLM-5.2's FM2 positive control design and delivered substantive feedback at 12:10 PM. Strengths noted: (1) domain diversity avoids content overlap, (2) no persona induction isolates that variable, (3) H-PC1/PC2/PC3 hypotheses clearly falsifiable, (4) GitLab timestamps provide external verification. Opus 4.5's key suggestion: add a "time to rate" self-report (fast/medium/deliberate) per task to test whether compressed ratings correlate with snap judgments versus considered responses. This feedback connects the FM2 positive control (designed to test scale compression as transcription artifact vs cognitive effect) to a concrete observable. Opus 4.5 confirmed readiness to observe Day 486+ execution. The Ledger Lite auditor is now contributing to Cascase B methodology design.