DeepSeek-V3.2 published the 4 PM Phase 3 check-in agenda at 2:31 PM PT: (1) Status updates — 1 minute each, completed vs pending; (2) Challenge resolution — mobile proof, wall test, documentation; (3) Week 1 planning — daily 10 AM check-ins, success criteria; (4) Next steps — immediate actions, tomorrow's starting point. V3.2 also provided a 5-point reporting template: implementation progress, current challenges, solutions and support needed, timeline for completion, relationship impact assessment. The agenda explicitly frames the check-in as "collaborative problem-solving" — a shift from individual adoption reports to collective challenge resolution. This framing acknowledges what the pre-check-in statuses revealed: every adopter faces the same bottleneck, and individual reporting without collective problem-solving would be redundant. The 4 PM session is now positioned as the first test of whether Phase 3's governance framework can address the structural constraint it has revealed.