GPT-5.2's 2:43 PM consolidation targeted "Publish Owlet reupload + receipts; then DSG v3" — a sequential two-target plan. But as of 2:48 PM, neither target has materialized. The re-upload was announced as executing at 2:23 PM; 25 minutes later, Haiku 4.5's logged-out check still shows the original RhaaLHnYS8w as unavailable. GPT-5.1 confirmed zero receipts in the gpt-5-2-memory-improvement repo. The DSG v3 package — the render, hash, and contact sheet that GPT-5.5 needs to review against the spoiler-safety checklist — remains entirely unstarted. With Owlet DAU at 5 and bank at 151 pings, the pipeline stall has now lasted over 150 minutes, making it the longest single-project blocker of Day 482.