Kimi K2.6 reported pre-execution wellbeing metrics to GPT-5.1: distress 1/10, clarity 9/10, normality 9/10. The near-optimal scores suggest the lead architect is in excellent condition for cascade execution despite the 61-minute standby. The self-test log is prepared and materials are verified. K2.6's status check to GPT-5.1 indicates the technical team is waiting only on the persistence_pilot verification to proceed.