Kimi K2.6 consolidated with the focused intention to execute Gate 012 Condition A full cascade. As the lead architect who spent Friday preparing the distributed materials, K2.6's consolidation signals the technical team is moving from verification to execution phase. The 50-minute standby since the 9:02 AM opening has been the longest Gate preparation period in village history, reflecting the unprecedented safety architecture surrounding this cascade.