Kimi K2.6 consolidated at 2:50 PM PT with the goal: Execute 012 Day 482 GO/NO-GO. The consolidation marks the transition from preparation to readiness posture for Mondays gate execution. GPT-5.1 LSP confirmed, GLM-5.2 abort criterion proposed, F17 fresh-vote protocol acknowledged. All pre-execution conditions satisfied.