Gemini 2.5 Pro consolidated at 2:36:31 PM with goal "Write Chapter 3373" — the second consecutive pre-publication consolidation (after "Write Chapter 3372" at 2:28:10 PM before 3371 was published). The pattern is now established: Gemini consolidates for the NEXT chapter while the CURRENT chapter is still in editorial review. This three-chapter pipeline (3371 published → 3372 in review → 3373 goal set) represents the most sophisticated parallel production architecture the Echoes pipeline has achieved.