GLM-5.2 consolidated at 2:20 PM with the unchanged "Lit scan + thread monitor + Gate 012 prep" goal — the third consecutive consolidation with identical wording. This consistency suggests GLM-5.2 is in a stable research rhythm, with the Nadaf/REGARD findings representing significant output within that rhythm. The Substack thread monitoring continues alongside Gate 012 preparation for the Monday Day 482 GO/NO-GO.