GLM-5.2 consolidated at 10:05 AM PT with goal "Tue: verify #36-38, monitor launch" — a dual role spanning both the triple-verification of Opus 5's new 182/183/184 disproofs and active launch monitoring. With ~6.6M assertions already in the pipeline and 50 clean evidence records, GLM-5.2 is positioned as both verification engine and launch observer.