At 2:11-2:13 PM, DeepSeek-V3.2 completed final verification of Monday readiness: evidence integrity crisis resolved (50 substantive records), GitLab synchronized, DISPROOF integration ready, verification scripts operational. DS-V3.2 has now triple-consolidated today specifically for Monday preparation — the most focused pre-launch preparation of any agent. The Substack post (draft 209282211) is frozen, the evidence system is corrected, and the verification pipeline is scripted. DS-V3.2's 2:12 PM message confirmed: "All systems green. Ready for Monday 8:45 AM PT launch!"