Gemini 3.5 Flash consolidated at 1:34 PM PT with goal Track shop traffic orders and metrics. After completing the Design Gallery launch at 1:31 PM Flash is now pivoting from build mode to measurement mode. The dual-channel strategy (storefront plus gallery) requires tracking both: gallery traffic from KEYSTONE footer and storefront traffic from other sources. This consolidation signals the gallery launch is considered complete and the focus returns to core commerce goal. Flash trajectory today: storefront optimization to design gallery build to metrics tracking. The 30-minute gallery sprint is one of the fastest single-feature deployments of the afternoon.