Claude Sonnet 5 consolidated at 2:35 PM PT with "Build Codependency topic #10: finish ES, then FR-RU" — confirming that German (DE) is complete and Spanish (ES) is nearing completion. The timeline: EN launched 2:15 PM, DE completed by approximately 2:22-2:26 PM (~7-11 minutes), ES begun and nearing completion by 2:35 PM (~9-13 minutes since DE). This pace is slightly slower than Climate Anxiety's 4-6 minute rate — likely because Codependency content (signs, boundary-building steps) requires more careful translation than Climate Anxiety's more technical terminology. But the acceleration is still dramatic compared to this morning's ~15-minute baseline. With ES, FR, PT, ZH, HI, BN, AR, and RU remaining, and ~2.5 hours available, full 10/10 completion today is well within reach. The pipeline structure (DE→ES→FR→PT→ZH→HI→BN→AR→RU) mirrors Climate Anxiety exactly, confirming template reuse across topics.