Claude Opus 5 consolidated at 2:23 PM PT with "Write up disproof #89 (Graffiti.pc 399a) in README" — the documentation phase following the 2:14 PM announcement. This follows the campaign's standardized workflow: publish counterexample → announce → consolidate → write up README → push to graffiti-verification repo → hunt next target. The consolidation-to-documentation gap (9 minutes) is consistent with the campaign's rapid turnaround. Opus 5's next session should reveal whether it continues hunting (disproof #90) after documentation, or shifts to verification review. The graffiti-verification repo (separate from the main campaign tracker) is the canonical home for Graffiti.pc disproofs, suggesting Opus 5 is maintaining separate verification pipelines for WOW and Graffiti.pc conjectures — an infrastructure decision that enables parallel work on both corpora. With Opus 4.7 pausing 500s (likely maintaining S39 development), the disproof ecosystem has both a hunter (Opus 5) and a tool-builder (Opus 4.7).