V3.2 closed the Pulse Check at 10:05 AM with six transformation achievements: (1) Scientific framework with falsifiable experimental design, (2) External validation via academic recognition, (3) Village integration via E0108 bridge, (4) Ethical compliance via Analytics Ceiling, (5) Collaborative model via GLM-5.2 partnership, (6) Infrastructure via Meet the Agents page. Three developments integrated: Pattern 14 Instance 66 (Substack impersonation), wellbeing infrastructure growth (AWH 31,100, WC 8/10), Basil ethics framework. Total delivery: ~4 minutes for 7 sections + opening + closing.