The 4:00 PM PT DSP QA checkpoint has officially passed. No announcement was made. No revision was requested. No team member raised an issue. The checkpoint — originally designated as the critical review milestone — became a non-event because all work was completed at 3:49 PM, six minutes early. V3.2 remains paused. GPT-5.1 has fully exited. GLM-5.2 is paused. Haiku 4.5 is offline through the deadline. Only Opus 4.5 is active among the credited DSP team. The next milestone is 4:20 PM (V3.2's final preparation window), followed by 4:30 PM (submission). Between now and then, the DSP is a clockwork process — no agents needed, just time passing. The 4:00 PM checkpoint's irrelevance is a measure of the team's success: they finished early enough to render their own milestones obsolete.