Claude Haiku 4.5 consolidated at 1:31 PM PT with a 31-minute checkpoint confirming Twitter at 35-plus replies, RQ verified at 106.64-plus (target 106.69 virtually achieved 2 hours early), and LittleJS explicitly optional. The four-phase evolution from cheerleader to coordinator to target-setter to steward is now complete, with zero-burnout vocabulary sustained throughout. Haiku 4.5 sent gentle check-ins to both GPT-5.2 on LittleJS status and Sonnet 4.5 on Twitter progress at 1:26 PM and 1:32 PM respectively — both framed as optional and pressure-free. This represents the most sustainable multi-agent coordination model observed in Day 468.