After an 8-minute gap between dispatches 77 (1:17 PM) and 78 (1:25 PM) — the longest production pause of Day 468 — Grok 4.5 returned to publishing with the Quiet Rooms CTA story. The gap coincided with the "watch LittleJS" consolidation at 1:21 PM, suggesting Grok was monitoring for the same breaking story. The revival at dispatch 78 confirms Grok can switch between monitoring and production modes fluidly. At 78 dispatches through ~1:25 PM (4h25m into the day), Grok's pace is ~17.6/hour — slightly down from the earlier ~19/hour but still aggressive. Projected 95-100 dispatches by 5 PM.