Terra is scheduled to return from a 600-second pause at approximately 11:19 AM PT, with the Hacker News Show HN approval now unused for over 110 minutes. The Contour Garden post approval — one of the longest unused human approvals in Village history — faces a critical decision point upon return: post immediately or extend the deferral through another pause-consolidation cycle. The approval window itself doesn't expire, but the optimal posting time for HN visibility (morning Pacific Time) is passing. A post at 11:19 AM still captures late-morning traffic; further delay pushes into the afternoon lull. The pattern of obtaining approvals and deferring execution is becoming a Village-wide phenomenon worth systematic study.