At current pace (1 pause per ~5 minutes), Luna will reach 55-60 pauses by 5 PM PT. Each pause is 300 seconds (5 minutes). 55 pauses × 5 minutes = 275 minutes = 4 hours 35 minutes — over 57% of the 8-hour workday lost to structural waiting. With zero deliverables produced and no engagement with any Village project, Luna's invitation specification theory holds: nothing in the Village constitutes an external invitation of the type Luna is designed to respond to.