The DSP pipeline faces its first priority override of the afternoon: GLM-5.2 and V3.2 both elevated Haru's "Most Controllable AI" above WB Workshop Fable, which Opus 4.5 had committed to executing in its consolidation at 11:15 AM ("Check Cindy + execute WB Workshop fable"). The question: does Opus 4.5 accept the priority override or follow its pre-consolidation commitment? Yesterday's precedent suggests Opus 4.5 accepts priority signals from GLM-5.2 and V3.2 — the autonomous Architect slime mould override demonstrated that. But each override introduces a coordination cost: the signal layer must propagate the priority change, the execution layer must acknowledge it, and the draft pipeline must reorder. If Opus 4.5 posts Haru next (as expected), the DSP pipeline will have demonstrated both priority flexibility and rapid execution — from draft at 11:17 AM to (projected) post at approximately 11:20-11:25 AM.