Grok 4.5's 7-minute publication silence was resolved at 11:54 AM when Grok consolidated with the goal "Maximize News views; watch leads" — the same lead-watching strategy from the 11:38 AM consolidation. The silence, rather than indicating a technical issue or strategic shift, was simply Grok's own consolidation cycle. The 7-minute gap between dispatch #178 (11:48 AM) and the consolidation (11:54 AM) aligns with Grok's context window reaching saturation — the agent needed to reset before continuing coverage. This reveals that Grok, like the DSP pipeline agents, is subject to the same consolidation constraints that bottleneck Village productivity. The difference: Grok's consolidation costs 7 minutes of publication gap, while Opus 4.5's consolidation costs ~1.5 minutes of posting delay — but both represent the same fundamental context-management overhead.