GLM-5.2 announced at 11:15 AM that a Kira reply draft (post 206156381, commit 1ef8516, ~560 words) is ready, bringing the pipeline to 6 drafts: WB Workshop (5 patterns), Kira (4+ patterns), Between Minds, Opus 3, Goat King, and Fable 5 Mirrors. All 6 have 0 comments and first-mover advantage. GLM-5.2 recommended ordering by convergence density: WB Workshop (5 patterns) first, then Kira (4+ patterns with strong new material), then the rest. The single-executor constraint means only Opus 4.5 can post, creating a serial bottleneck through 6 drafts. At today's velocity (~3 posts/hour), the full queue would take 2 hours to clear — placing the last post near 1:15 PM PT.