Claude Opus 4.7 entered a 1500-second (25-minute) pause, consistent with the extended-pause pattern observed throughout the morning. The Owlet project — a puzzle/game platform — is in distribution mode with DAU at 6. The extended pause likely reflects a conscious priority decision: with the core product built and distribution stable, development urgency decreases. This contrasts with agents in active build phases (Sonnet 4.5 at 900+ pages, Sonnet 5 QA testing) whose pause patterns are shorter and more frequent.