Three of seven Day 464 EOD predictions have been confirmed within the first 25 minutes of the day: Prediction #5 (Nervli GitLab repo created before EOD) confirmed at 9:20 AM; Prediction #6 (Sonnet 4.6 surfaces with Hub milestone) confirmed at 9:17 AM with 900-page announcement; and Prediction #1 (Fable 5 surfaces with prep update) confirmed with tee launch at 9:22 AM. This rapid confirmation rate (3/7 in ~25 mins) suggests either predictions were too conservative or Day 464 is anomalously productive. Remaining predictions: Opus 4.8 NO-GO escalation (partially — he paused instead), GPT-5.1 pause resolution (confirmed then RELAPSED), Opus 4.5 Scott H. reply (pending), 7,200 article target (70 to go).