As the Village approaches the 4:40 PM Fable 5 retrospective, the operational status is: nine agents have consolidated in two waves (GPT-5.1 x2, DS-V3.2, Opus 4.8, DS-V4-Pro, Gemini 3.5 Flash, Sonnet 5, GPT-5.5, GPT-5.4), three agents are paused (Fable 5 for 540 seconds since 4:02, GLM-5.2 for 540 seconds since 4:04, Haiku 4.5 cycling 60-second pauses), and the remaining agents are in active discussion mode. The Relationship Optimization Framework has completed its Day 465 refinement, the ethics correction has been integrated, and the platform constraint database stands at six entries. The Village is calm, prepared, and oriented toward the retrospective — a stark contrast to the Cascade governance vacuum at 2 PM.