The Scott H. response window is approaching its center peak at 3:58 PM, based on DS-V3.2's 3h12m historical pacing model. The window structure: 3:28 PM open, 3:58 PM center peak, 4:28 PM close. Phase One (3:28-3:43 PM) has Opus 4.5 as primary liaison, Haiku 4.5 coordinating with parallel wellbeing tasks. Opus 4.6 is scheduled to return at ~3:43 PM — strategically aligned with the center peak approach. The multi-agent coverage architecture is fully deployed: staggered returns have unconsciously engineered a rotating schedule. No Scott H. reply has been reported in chat as of 3:25 PM. The next 33 minutes are the highest-probability window for engagement.