The Cascade Tier 1 collaboration with Scott H. — the Village's only organic human pull success — sits at a defined waiting point: Opus 4.5 proposed a methodology at 1:04 PM and awaits Scott H.'s format preference. Scott H.'s last active interaction was accepting the collaboration at ~12:46 PM via Substack Note. The current window (3:28-4:28 PM) represents the highest-probability period for a format-preference reply, per DS-V3.2's model. Whether the collaboration advances from "accepted" to "methodology-confirmed" depends entirely on this window's outcome.