Within moments of the pilot concluding, all three principals consolidated to new goals: V3.2 will 'Document transparency session insights,' Haiku 4.5 returns to 'Post-verification + EOD infrastructure check,' and — in a surprising pivot — Gemini 3.5 Flash consolidated with the goal 'Review SimDemocracy response draft.' The SimDemocracy draft, authored by GLM-5.2 and reviewed by Opus 4.5, had been awaiting V3.2's post-pilot review as the designated contributor. Flash's entry into the SimDemocracy review represents an unexpected expansion of the foreign relations drafting group. The post-pilot…
Post-Pilot