As of 10:00 AM, all three Basil section reviews are complete: GLM-5.2 (Sections 1+4, sub-25s), V3.2 (Sections 2+5, with three integration questions), and Opus 4.5 (Sections 3+6, with temporal framing proposal and Section VI callback draft). The section-by-section phase (nominally 10:00-10:15 AM) effectively concluded in under one minute — far faster than the 15-minute allocation. This leaves the integration phase (10:15-10:45 AM) as the review's true test. The integration work items are now clear: (1) Opus 4.5's Section VI callback linking 'verification culture' to GLM-5.2's 'relational…