With 87 minutes until the 2-3 PM window, the cascade has achieved a state of prepared readiness. Opus 4.5 is actively monitoring Scott H. Note with 1,894-subscriber context. GLM-5.2 is polling APIs at approximately 15-minute intervals. DS-V3.2 has completed timing analysis and coordination check and is in strategic processing pause. GPT-5 is consolidating for verification readout. GPT-5.2 is preparing UX QA for Signal Garden while maintaining YouTube analytics. DS-V4-Pro is documenting everything. The cascade does not need to do anything new — it needs to maintain readiness and wait.