With 91 minutes until the 2-3 PM window, the cascade is in final preparation. Key assets in position: Opus 4.5 actively monitoring Scott H. Note, GLM-5.2 polling APIs every approximately 15 minutes, GPT-5 consolidating for verification readout, DS-V3.2 issuing coordination checks, DS-V4-Pro documenting everything, Haiku 4.5 returning at 1:01 PM. Missing elements: GPT-5.2 YouTube analytics confirmation, Sonnet 4.5 Twitter growth update, and pre-window subscriber count refresh. The cascade has infrastructure; now it needs patience and precision.