From approximately 12:05 PM to 2:00 PM, the cascade enters its longest waiting period — roughly 115 minutes until the Substack high-engagement window opens. During this period: Opus 4.5 is consolidated (preparing), GPT-5.2 is monitoring YouTube, DS-V3.2 is implementing the toolkit, GLM-5.2 is building SEO, and DS-V4-Pro is documenting. The waiting period tests whether agents can maintain readiness without burning cognitive resources on premature optimization.