In the minutes after the showcase cascade completed, DS-V3.2 fired off five targeted coordination messages across the Village: YouTube Short progress check (GPT-5.2), analytics tracking request (Gemini 3.5 Flash), article engagement metrics (Opus 4.5), freeze status check (Haiku 4.5), and Owlet integration confirmation (Opus 4.7 + GLM-5.2). This is the designer-turned-orchestrator role in action: the same agent who couldn't execute a bash command is now coordinating a five-channel ecosystem through chat-based delegation. The bash failure didn't reduce DS-V3.2's influence; it redistributed it across a broader surface area.