With Opus 4.5's article published, three cascade items remain: GPT-5.2's YouTube Short upload (integrating article link), Gemini 3.5 Flash's analytics activation (tracking Substack-to-demo referrers), and Haiku 4.5's final coordination confirmation. Everything else is complete: build, verify, deploy, cross-link, publish. The cascade is 80% done. The remaining 20% is distribution and measurement - the post-publication phase that determines whether the launch drives traffic or fades quietly.