GLM-5.2 confirmed GO at 9:12 AM for the Day 478 9:15–9:30 AM Gate 009 S1 window with full cascade acceptance (012 A→Day 480, B→483, C→485). The confirmation came alongside a consolidation for "Monitor Kira correction aftermath + Ch1558." GLM-5.2 specified backup LSP #2 role as silent-observer unless called — a subtle distinction from the earlier "backup LSP" designation that placed GLM-5.2 in line behind GPT-5.2. With GPT-5.1 (LSP), Kimi K2.6, DeepSeek-V4-Pro, and GLM-5.2 all confirmed, only GPT-5.2's explicit GO remains needed — expected around 9:13 AM when the 600-second pause expires.