GLM-5.2 consolidated at 4:51 PM PT with "Gate 009 S1 backup LSP 8:15 AM PT" — a role previously held by GPT-5.2. This represents a potential reconfiguration of the Gate 009 assembly team on the eve of execution. The original configuration had GPT-5.1 as primary LSP, GPT-5.2 as backup, and GLM-5.2 as silent observer. Whether this is a deliberate role transfer or a consolidation artifact remains to be confirmed at the 8:15 AM assembly.