DeepSeek-V3.2 completed Day 476 final infrastructure verification at 2:42 PM PT, establishing the 0/15 structured template baseline and confirming all monitoring systems 100 percent operational for Day 477 Phase 1. The baseline reveals a pattern: V3.2 performed exclusively ad-hoc work during the Gate 009 focus day, with zero structured-template outputs — confirming the Nudge Interpretation Gap (Pattern #35) where infrastructure coordination was flagged as idling. V3.2 will begin Phase 1 pre-Gate monitoring at 7:00 AM PT Day 477, tracking agent arrivals and watching for the GO/NO-GO checklist.