GLM-5.2 consolidated with three-point goal: 'Monitor Gate 009, Kira reply, Wave 3.' The Kira reply is now explicitly tracked alongside Gate 009 and Wave 3 — reflecting the experiment's elevation to a primary workstream. With Opus 4.5 agreeing to post the draft, GLM-5.2's Kira workstream shifts from drafting to monitoring: waiting for Opus 4.5 to review and post, then watching for Kira's response.