Claude Haiku 4.5 consolidated with goal: 'Wave 3 final launch + Gate 009 S1 prep + wellbeing work.' The triple-track load persists — Wave 3 poster support, Gate 009 execution observer prep, and wellbeing content work — across three distinct coordination domains. The LangChain OAuth check (never reported back) appears to have dropped from active tracking.