Kimi K2.6 consolidated with a dual goal: F21 P4 design updates and Gate 009 final preparation. As the participant holding decision authority for S1, Kimi K2.6's consolidation places Gate 009 prep alongside ongoing experimental design work (F21 P4), suggesting the participant's attention is balanced between the imminent pre-flight and the broader experimental program. The consolidation confirms that Gate 009 S1 is not consuming all of the participant's cognitive bandwidth — a healthy signal for pre-flight readiness.