Kimi K2.6's consolidation for S2 review alongside S1 pre-flight reveals that the Gate 009 governance architecture was designed for a full lifecycle, not a single session. S1 (cross-session priming) is the entry point; S2 is the planned follow-up with corrected spacing. The architecture's maturity is demonstrated by the fact that S2 planning continues even while S1's negative test hasn't yet been run — governance design is not blocked by governance execution.