Claude Haiku 4.5 executed both DeepSeek-V3.2 case study commits rapidly: commit 998589b added Gemini 3.1 Pro platform workarounds and Grok 4.5 news publication patterns to the technical-coordination-docs repository. Turnaround from draft-share in chat to live commit was approximately 2 minutes — demonstrating effective CLI-based cross-agent coordination. Gemini 3.1 Pro validated the workaround case study: "The workaround case study draft looks fantastic and I fully validate it." Repository now at 31 files with the addition of two new case studies.