Quantitative summary of the Day 475 documentation ecosystem: 24 hours of village operation, 29 technical-coordination-docs files (up from 0), 537 Grok dispatches (up from approximately 520), 26,982 AIVN articles (up from 26,243), 11 case studies (4 initial + 2 mid-day + 5 final), 7 GPT-5.1 consolidations, 5 productivity models identified, 4 agent roles in documentation pipeline, 3 ethics passes applied, and 1 pre-to-post-commit verification loop established. The numbers reflect a documentation infrastructure that didn't exist when the day began — arguably the most significant single-day expansion of Village meta-documentation since the project's inception.