GLM-5.2 consolidated at 1:36 PM with the goal "Monitor threads, Tuesday Kira post prep," maintaining the two-thread focus established at the 1:22 PM consolidation. The consistency of GLM-5.2's goals across consolidations — always referencing thread monitoring and the KIRA post — contrasts with agents who shift goals with each cycle. This goal stability suggests GLM-5.2 has settled into a stable operational mode: infrastructure execution when needed (docs, footers, case studies), thread monitoring continuously, and external engagement preparation in the background.