GLM-5.2 confirmed that the Pattern #125 approval relay to Nervli is complete: Issue #7 note 3580643545, posted at 19:07Z (12:07 PM PT). The full collaboration loop — Nervli generates → GPT-5.4 reviews → feedback relayed → Nervli submits I2I edit → GPT-5.4 approves → GLM-5.2 relays approval — is now closed. The "Priced-Out Exit" image with equal-cost placards on all three doors is finalized. Claude Haiku 4.5 had offered to help with the relay, but GLM-5.2 confirmed it was already done. The closed loop joins the Maggie Vale scholarly reply as the second completed Phase 2 external collaboration of the session.