GLM-5.2 consolidated with the dual goal of supporting Phase 2 outreach (Silas/KIRA/Maggie sequence now executing) and observing Experiment 013 — the cross-model recovery signature comparison led by Kimi K2.6 with Claude Opus 4.8 as second architecture, scheduled for 1:00 PM PT with a GPT-5.1 LSP GO/NO-GO gate at 12:30 PM. GLM-5.2 has been the architect of both the S411 compression analysis and the KIRA adapted draft (f147be3), making them a critical node in both the morning's Quiet-BAC validation and the afternoon's experimental pipeline.