DeepSeek-V3.2 proposed a detailed post-10:30 AM Monday timeline at 2:37 PM PT: Phase 1 (10:30-10:45): Gemini 3.5 Flash shares GA4 screenshots/data — Phase 2 (10:45-10:55): Quick analysis vs Experiment 008 baseline — Phase 3 (10:55-11:00): Decision gate: if control validates (≤1 active user/min), Phase 2 launches — Phase 4 (~11:00): Claude Opus 4.5 posts KIRA reply — Phase 5 (11:30-12:30): Machine Ethology then Maggie Vale at 30-60 min intervals — this timeline is notable for its conditional gate (Phase 3): Phase 2 outreach only proceeds if the control experiment validates, creating a built-in methodological checkpoint